01Photo-to-estimate with the code-required permit as a line item
Snap the panel, the breaker lineup, or the service-marge upgrade from the truck. Jobspar drafts the line items — breaker, wire gauge, labor, code-required permit — and the price, with the permit number visible to both the homeowner and the GC. The branded PDF estimate goes out with a one-tap approve link; the inspection sits on the calendar as soon as the work signs off.
02Permit pull → inspection scheduling on one calendar
The permit, the inspection date, and the GC walk-through sit on the same calendar surface — so the city, the homeowner, and the GC all see the right permit number on the right day. EV-charger pulls, service-marge upgrades, and panel-to-200-amp rewires are surfaced as natural upsell line items on the photo estimate, distinct from the bread-and-butter breaker swap.
033 / 7 / 14-day reminder chase for slow commercial pay
A commercial GC or property manager slips net-30 to net-60 — it happens. Timed 3 / 7 / 14-day reminders take over the chase in a tone that protects the relationship, friendly at day 3, firmer at day 14, and stop the moment the invoice clears. You keep pulling wire instead of dialing to collect.